Building and Grounds (B&G) at Work
The B&G committee has been working on many items for safety within and around the building. Some of these projects are supported by your generosity to “Love One Another.”
Projects Completed for Increased Safety
~All rooms, upstairs and down, have been numbered on the inside of each room, outside of each room window, and on each room door. This will help identify a person’s location in case of an emergency. Each entrance/exit is identified with numbers 1 through 6. Thanks to the members of B&G who made this happen.
~The west church entrance concrete has been shaved down to eliminate tripping hazards. Thanks to a member of B&G who funded this project.
~Cameras have been installed at entrances and hallways to monitor activity in the parking lot, entries, and hallways around the church, Daniels Hall, and the upstairs rooms.
~Trees around the air conditioning unit were removed for visibility of room numbers and the building.